How soon must I begin work once I have received a permit?
If no work has begun within 180 days of the issuance of a permit, then the project shall be deemed abandoned, unless an extension has been granted. If you need an extension for an unforeseen delay, please contact the Building Department at 402.426.4191.

Show All Answers

1. When is a building permit required?
2. How much does a permit cost?
3. How long does it take to process a permit?
4. Do I have to remove old layers of roof material when I am applying a new roof?
5. When does a structure require footings?
6. When are footings to be inspected?
7. Do I need a permit to perform electrical services in my own home?
8. If the City issues me a building permit, but the Building Inspector finds violations when performing an inspection, does having a permit make those violations allowable?
9. How soon must I begin work once I have received a permit?
10. When is it required to have building plans and drawings stamped by an engineer or architect licensed in Nebraska?
11. When are emergency egress windows required in single family homes?